انتقل إلى المحتوى
الشركة

شركة صغيرة تبيع خوادم

بدأت Echelon عام 2014 بأربع خزائن في فرانكفورت وبقاعدة لم نخالفها منذ ذلك الحين: لا نطلب من عميل وثيقة ما كنا لنرضى بتخزينها نحن أنفسنا.

تأسست
2014
أشخاص
19
خزائن تحت الإدارة
214
النظام المستقل
AS204915
01

بالأرقام

بالأرقام

خوادم عاملة

41820

الموقع

42

دولة

31

الجاهزية خلال 24 شهرًا

99.987 %

02

الخط الزمني

الخط الزمني

  1. 2014

    Four racks in Frankfurt, then Amsterdam

    Two engineers, a purchase order for eight Opteron hosts, and a decision not to ask customers for documents. The first instance was sold in November for €4 a month on a six-month term; Amsterdam followed six weeks later.

  2. 2015

    Paris, London, New York

    The first year of real growth. AS204915 is assigned and we start peering at AMS-IX and LINX rather than buying transit for everything.

  3. 2016

    Zurich, and a written policy

    The acceptable use policy is published in the form it still has today: two pages, plain language, no discretionary clauses. Riga and Bucharest open the same year.

  4. 2017

    Profitable, and unfunded

    We turn down a term sheet. Singapore and Tokyo open, along with Warsaw and Chișinău, and the fleet passes five thousand instances.

  5. 2018

    Everything moves to EPYC

    The Naples-generation refresh doubles per-socket density. Existing customers are moved to the new hardware at their old price, and renewal rates drop for the first time.

  6. 2019

    Crypto becomes the only way to pay

    Card processing is retired after a fourth acquirer demands customer identity documents. Payments move entirely to crypto, and the last stored personal data is deleted.

  7. 2020

    Seven sites in one year

    Demand from remote work and from people leaving the large clouds. Roubaix, Helsinki, Reykjavík, Seattle, Mexico City, Mumbai and Dubai all come online.

  8. 2021

    The console is rewritten

    Version 3 of the control panel ships: one code path for the web console, the REST API and the Terraform provider. Response times drop by two thirds.

  9. 2022

    Power crisis, prices held

    European electricity triples. We absorb it rather than repricing mid-term, take a loss for two quarters, and publish the numbers.

  10. 2023

    Genoa, DDR5, Gen4 NVMe

    The current hardware standard lands. Single-thread throughput rises 38% against the previous generation and storage latency halves.

  11. 2024

    Ten years, forty-two sites

    The anniversary is marked by cutting the twelve-month rate on every plan rather than by a press release.

  12. 2025

    14 Tbit/s at the edge

    Scrubbing capacity is doubled after a 1.9 Tbit/s attack on a customer in Amsterdam is absorbed without a dropped packet on neighbouring instances.

  13. 2026

    Console v4

    A full rebuild of the customer console, the fifteen-language site you are reading, and per-second resource graphs on every instance.

20142026 · 12 سنة

03

كيف نعمل

كيف نعمل

01

العتاد ملكنا

كل مضيف نشتريه بالكامل ونركّبه بأيدينا ونحتفظ به خمس سنوات. لا شيء يُعاد بيعه من سحابة غيرنا.

02

الأسعار تنخفض ولا ترتفع

العتاد يرخص مع كل جيل. وحين يحدث ذلك، يحصل العملاء الحاليون على السعر الجديد عند التجديد دون أن يطلبوه.

03

الدعم مهندسون

لا يوجد خط أول يقرأ نصًا جاهزًا. من يرد على التذكرة يملك صلاحية root على المُشرف الافتراضي.

04

نعرف كيف نرفض

نرفض أعمالًا قد تعرّض الشبكة للخطر — ونقول ذلك علنًا بدل قطع الخدمة عن الناس بصمت.

04

بيانات الناشر

بيانات الناشر

Legal entity
Echelon Infrastructure OÜ
Registered office
Sepapaja 6, 15551 Tallinn, Estonia
Autonomous system
AS204915
Founded
2014
التذاكر
[email protected]
الإساءة وDMCA
[email protected]
التبادل
[email protected]

نرفض أعمالًا قد تعرّض الشبكة للخطر — ونقول ذلك علنًا بدل قطع الخدمة عن الناس بصمت.